iz · Bench · Afyonkarahisar Cement Plant

cement · Afyonkarahisar · 1,800,000 t/y

Afyonkarahisar Cement Plant

Afyon Çimento

01 Snapshot

Audit-grade Scope 1 · 2024
1,200,000
tCO₂ · direct · ISO 14064-1 verified
cf-corrected formula (leave-one-plant-out)
707,218
-41% vs. truth
EU CBAM default
2,851,200
+138% vs. truth
95% conformal prediction interval (formula, leave-one-plant-out, n=19): 382,7171,306,862 tCO₂ (truth inside ✓)
95% interval restricted to cement calibration set: 446,0351,121,341 tCO₂ (truth outside ✗ · undercoverage caveat at small n)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Afyon Çimento
Plant
Afyonkarahisar Cement Plant
Sector
cement
City
Afyonkarahisar
Capacity
1,800,000 t/y
Label source
disclosure
Provenance
Per-plant Scope 1 directly disclosed by operator.
Headline method
cf-corrected formula (capacity × route-EF × cf), evaluated leave-one-plant-out. +82.3% log-MAE reduction vs EU default across the 19 validatable plants.

03 Source citation

Afyon Çimento 2024 TSRS Sustainability Report p23

Standalone subsidiary (Çimsa 51%); 1.1M ton cement production; ISO 14064 + TSRS limited assurance

05 Hyperspectral coverage

8 EnMAP L2A scenes index this plant (4 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology at iz-mrv.pages.dev/paper.