iz · Bench · Büyükçekmece Cement Plant

cement · Büyükçekmece · 2,500,000 t/y

Büyükçekmece Cement Plant

Akçansa

01 Snapshot

Audit-grade Scope 1 · 2025
1,514,000
tCO₂ · allocated · operator-audited financial-grade
cf-corrected formula (leave-one-plant-out)
1,791,305
+18% vs. truth
EU CBAM default
3,960,000
+162% vs. truth
95% conformal prediction interval (formula, leave-one-plant-out, n=19): 969,3793,310,134 tCO₂ (truth inside ✓)
95% interval restricted to cement calibration set: 1,055,7033,039,465 tCO₂ (truth inside ✓ · undercoverage caveat at small n)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Akçansa
Plant
Büyükçekmece Cement Plant
Sector
cement
City
Büyükçekmece
Capacity
2,500,000 t/y
Label source
disclosure
Provenance
Allocated from operator group Scope 1 by a disclosed physical share (clinker tonnage / crude steel tonnage).
Headline method
cf-corrected formula (capacity × route-EF × cf), evaluated leave-one-plant-out. +82.3% log-MAE reduction vs EU default across the 19 validatable plants.

03 Source citation

Akçansa 2025 IAR p46 (group Scope 1 gross 5,484,015) × Büyükçekmece clinker share p167 (1,943/7,037 = 27.6%)

Akçansa IAR archive

Allocated from Akçansa 2025 group Scope 1 (5,484,015) × Büyükçekmece clinker share 27.6%. Group total is audit-grade; per-plant split is by disclosed clinker tonnage, not directly disclosed.

05 Hyperspectral coverage

5 EnMAP L2A scenes index this plant (1 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology at iz-mrv.pages.dev/paper.