iz · Bench · Çanakkale Cement Plant

cement · Lapseki · 5,500,000 t/y

Çanakkale Cement Plant

Akçansa

01 Snapshot

Audit-grade Scope 1 · 2025
3,466,000
tCO₂ · allocated · operator-audited financial-grade
cf-corrected formula (leave-one-plant-out)
3,865,919
+12% vs. truth
EU CBAM default
8,712,000
+151% vs. truth
95% conformal prediction interval (formula, leave-one-plant-out, n=19): 2,092,0727,143,792 tCO₂ (truth inside ✓)
95% interval restricted to cement calibration set: 2,278,3746,559,647 tCO₂ (truth inside ✓ · undercoverage caveat at small n)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Akçansa
Plant
Çanakkale Cement Plant
Sector
cement
City
Lapseki
Capacity
5,500,000 t/y
Label source
disclosure
Provenance
Allocated from operator group Scope 1 by a disclosed physical share (clinker tonnage / crude steel tonnage).
Headline method
cf-corrected formula (capacity × route-EF × cf), evaluated leave-one-plant-out. +82.3% log-MAE reduction vs EU default across the 19 validatable plants.

03 Source citation

Akçansa 2025 IAR p46 × Çanakkale clinker share p167 (4,450/7,037 = 63.2%)

Akçansa IAR archive

Allocated from Akçansa 2025 group × clinker share 63.2%. See Büyükçekmece note.

05 Hyperspectral coverage

11 EnMAP L2A scenes index this plant (9 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology at iz-mrv.pages.dev/paper.