iz · Bench · Bandırma Plant

fertilizer · Bandırma · 700,000 t/y

Bandırma Plant

BAGFAŞ

01 Snapshot

Audit-grade Scope 1 · 2024
9,828
tCO₂ · direct · operator-audited financial-grade
cf-corrected formula (leave-one-plant-out)
single-plant route — not independently validatable
EU CBAM default
560,000
+5598% vs. truth

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
BAGFAŞ
Plant
Bandırma Plant
Sector
fertilizer
City
Bandırma
Capacity
700,000 t/y
Label source
disclosure
Provenance
Per-plant Scope 1 directly disclosed by operator.
Headline method
cf-corrected formula (capacity × route-EF × cf), evaluated leave-one-plant-out. +82.3% log-MAE reduction vs EU default across the 19 validatable plants.

03 Source citation

BAGFAŞ 2024 Sustainability Report p41-44

2024 was a partial-capacity year for BAGFAŞ (cf=0.29). An average-utilization year would push Scope 1 ~3× higher. N₂O catalyst installed 2015 cuts ~80% of nitric-acid process N₂O.

05 Hyperspectral coverage

4 EnMAP L2A scenes index this plant (1 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology at iz-mrv.pages.dev/paper.