iz · Bench · Aliağa Plant
01 Snapshot
Audit-grade Scope 1
350,000
tCO₂ ·
cf-corrected formula (leave-one-plant-out)
—
not in audit-grade set
EU CBAM default
3,800,000
+986% vs. truth
Open printable audit summary →
One-page PDF you can hand to a verifier.
02 Facility data
- Company
- Diler
- Plant
- Aliağa Plant
- Sector
- steel
- City
- Aliağa
- Capacity
- 2,000,000 t/y
- Label source
- cf_corrected
- Provenance
- Headline method
- cf-corrected formula (capacity × route-EF × cf), evaluated leave-one-plant-out. +82.3% log-MAE reduction vs EU default across the 19 validatable plants.
06 Verify / correct
If you're an operator or analyst with a more recent disclosure than what's shown above:
Corrections that include a verifiable public source land within 24 hours.
All data is Apache-2.0 licensed; methodology at iz-mrv.pages.dev/paper.