iz · Bench · Hereke Cement Plant

cement · Hereke · 5,700,000 t/y

Hereke Cement Plant

Nuh Çimento

01 Snapshot

Audit-grade Scope 1 · 2024
3,584,953
tCO₂ · direct · TSRS independent assurance
cf-corrected formula (leave-one-plant-out)
2,466,776
-31% vs. truth
EU CBAM default
9,028,800
+152% vs. truth
95% conformal prediction interval (formula, leave-one-plant-out, n=19): 1,334,9154,558,330 tCO₂ (truth inside ✓)
95% interval restricted to cement calibration set: 1,453,7914,185,597 tCO₂ (truth inside ✓ · undercoverage caveat at small n)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Nuh Çimento
Plant
Hereke Cement Plant
Sector
cement
City
Hereke
Capacity
5,700,000 t/y
Label source
disclosure
Provenance
Per-plant Scope 1 directly disclosed by operator.
Headline method
cf-corrected formula (capacity × route-EF × cf), evaluated leave-one-plant-out. +82.3% log-MAE reduction vs EU default across the 19 validatable plants.

03 Source citation

Nuh Çimento 2024 TSRS Report p56 (refined)

Cement-only parent (excludes Nuh Beton 43k + Nuh Yapı 237k); replaces earlier 3,573,278 estimate; cement EF 0.875 t/t clinker

05 Hyperspectral coverage

7 EnMAP L2A scenes index this plant (2 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology at iz-mrv.pages.dev/paper.