iz · Bench · Mersin Fertilizer Plant

fertilizer · Mersin · 810,000 t/y

Mersin Fertilizer Plant

Toros Tarım

01 Snapshot

Audit-grade Scope 1 · 2024
383,150
tCO₂ · allocated · TSRS independent assurance
cf-corrected formula (leave-one-plant-out)
280,204
-27% vs. truth
EU CBAM default
648,000
+69% vs. truth
95% conformal prediction interval (formula, leave-one-plant-out, n=19): 151,635517,787 tCO₂ (truth inside ✓)

Open printable audit summary → One-page PDF you can hand to a verifier.

02 Facility data

Company
Toros Tarım
Plant
Mersin Fertilizer Plant
Sector
fertilizer
City
Mersin
Capacity
810,000 t/y
Label source
disclosure
Provenance
Allocated from operator group Scope 1 by a disclosed physical share (clinker tonnage / crude steel tonnage).
Headline method
cf-corrected formula (capacity × route-EF × cf), evaluated leave-one-plant-out. +82.3% log-MAE reduction vs EU default across the 19 validatable plants.

03 Source citation

Tekfen Holding 2024 TSRS p18 × cap 1.5M/3.3M

Allocated from Toros group (842,174) by NAMEPLATE CAPACITY share (45.5%). Mersin has the NH₃+urea line — likely process-heavier than capacity-share allocation reflects. Medium-confidence label.

05 Hyperspectral coverage

2 EnMAP L2A scenes index this plant (1 with <1% cloud cover). Source: DLR EOC STAC. Following Borger et al. (2025), these scenes can yield direct CO₂ and NO₂ plume retrievals at ~30 m spatial resolution.

Lowest cloud cover scenes (showing top 5):

Downloads require a free DLR EOWEB account (see enmap_access_howto.md).

06 Verify / correct

If you're an operator or analyst with a more recent disclosure than what's shown above:

Corrections that include a verifiable public source land within 24 hours. All data is Apache-2.0 licensed; methodology at iz-mrv.pages.dev/paper.